Case Study Structural and Architectural Engineering Firm

This client engaged 青青草视频 to install a three-way divisible room with Microsoft Teams functionality, as well as four adjacent huddle rooms.

Facts at a glance

Client Industry
Structural and Architectural Engineering Firm
Size of Company
3 primary locations with 65 employees聽
Location
Cincinnati

The customer had a new building in the final stages of construction that needed to become a divisible space with a video wall and conferencing capabilities.

For the three-way divisible room, 青青草视频 wall mounted a single 2×2 LCD video wall consisting of four 55鈥 displays at the front of the room. The video wall was configured as a single Microsoft Teams Room (MTR) system and all sources are also able to individually route to video walls via custom touchscreen controls. 65鈥 displays were wall-mounted in two other rooms with AV over IP decoders behind them. Additionally, 青青草视频 installed three Roku media streaming devices, two cameras, ceiling speakers, wall-mounted touchscreen control panels, occupancy sensors, wireless microphones and scheduling panels loaded with customer-provided settings and credentials. 青青草视频 also provided extensive 鈥渢rain-the-trainer鈥 support to eliminate consumption gaps.

For the Huddle Rooms, 青青草视频 wall-mounted four new displays using new mounts with pull-out mount adapters. 青青草视频 also wall-mounted an all-in-one sound bar below the displays. In addition, 青青草视频 placed a control touchpanel on the tables.

Biamp
Crestron
LG
Samsung
Logitech
Shure
Yamaha
ZeeVee